{"id":3838,"date":"2025-04-22T02:01:49","date_gmt":"2025-04-21T23:01:49","guid":{"rendered":"https:\/\/relinvestmentsgroup.com\/?p=3838"},"modified":"2025-04-22T02:01:49","modified_gmt":"2025-04-21T23:01:49","slug":"vetnam-uvelichit-moshhnost-elektrostantsij-s-investitsiyami-v-razmere-136-3-mlrd-dollarov-k-2030-godu","status":"publish","type":"post","link":"https:\/\/relinvestmentsgroup.com\/en\/vetnam-uvelichit-moshhnost-elektrostantsij-s-investitsiyami-v-razmere-136-3-mlrd-dollarov-k-2030-godu\/","title":{"rendered":"Vietnam to Boost Power Capacity With $136.3bn Investment by 2030"},"content":{"rendered":"<p><\/p>\n<p class=\"p1\">Vietnam plans to significantly boost its power generation by 2030 through a revised national power plan, emphasizing renewable energy and the reintroduction of nuclear power. The initiative, requiring a $136.3 billion investment, represents over a quarter of Vietnam\u2019s 2024 GDP and aims to reduce dependence on coal, which currently dominates the energy sector.<\/p>\n<p class=\"p1\">The government targets an increase in installed power capacity from over 80 gigawatts (GW) in 2023 to between 183GW and 236GW by 2030. A key component is the revival of nuclear power, with initial plants expected to generate up to 6.4GW between 2030 and 2035. By mid-century, an additional 8GW is planned. The nuclear program, paused in 2016 due to safety concerns and financial limitations, is now being re-evaluated, with interest in small modular reactors noted for their potential cost efficiency.<\/p>\n<p class=\"p1\">Vietnam is collaborating with international partners, including Russia, Japan, South Korea, France, and the United States, for nuclear projects.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p class=\"p1\">The power plan also prioritizes renewable energy growth. Solar power is projected to account for 25.3% to 31.1% of capacity by 2030, up from 23.8% in 2020. Wind energy is expected to contribute 14.2% to 16.1%, a significant rise from near-zero levels. Offshore wind projects, targeting 6GW to 17GW by 2035, are planned, though no such facilities are currently operational.<\/p>\n<p class=\"p1\">To balance the energy mix, coal-fired plants will be reduced to 13.1% to 16.9% of capacity, while liquefied natural gas plants will comprise 9.5% to 12.3%. The government stated: \u201cThis plan ensures sustainable energy development while meeting growing demand and environmental goals.\u201d The strategy reflects Vietnam\u2019s commitment to diversifying its energy sources and enhancing capacity to support economic growth.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Vietnam plans to significantly boost its power generation by 2030 through a revised national power plan, emphasizing renewable energy and the reintroduction of nuclear power. The initiative, requiring a $136.3 billion investment, represents over a quarter of Vietnam\u2019s 2024 GDP and aims to reduce dependence on coal, which currently dominates the energy sector. The government [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3839,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bez-rubriki"],"featured_image_src":{"landsacpe":["https:\/\/relinvestmentsgroup.com\/wp-content\/uploads\/2025\/04\/Energy-56-1000x445.jpg",1000,445,true],"list":["https:\/\/relinvestmentsgroup.com\/wp-content\/uploads\/2025\/04\/Energy-56-463x348.jpg",463,348,true],"medium":["https:\/\/relinvestmentsgroup.com\/wp-content\/uploads\/2025\/04\/Energy-56-300x200.jpg",300,200,true],"full":["https:\/\/relinvestmentsgroup.com\/wp-content\/uploads\/2025\/04\/Energy-56.jpg",1000,667,false]},"_links":{"self":[{"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/posts\/3838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/comments?post=3838"}],"version-history":[{"count":1,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/posts\/3838\/revisions"}],"predecessor-version":[{"id":3840,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/posts\/3838\/revisions\/3840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/media\/3839"}],"wp:attachment":[{"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/media?parent=3838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/categories?post=3838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/relinvestmentsgroup.com\/en\/wp-json\/wp\/v2\/tags?post=3838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}